This product is used on concrete floors with humidity problems, generally as an adhesion primer in environments where solvent - based products cannot be used.
Appearance of the film
Matt
Color
Light grey
Components
2
Hardening
Chemical reaction between two components
Specific weight
1,250 gr/ml (A + B)
Volume of solids
53%
VOC
0 gr/ liter
Minimum thickness
40 - 50 micron
Estimated yield
10,6 m² / litre for a thickness of 50 microns
Flash point
Component A >113°C Component B >113°C
Adhesion
On concrete 2,5 MPa On majolica - tiled stoneware 12MPa ASTM D 4541
Preparation of surfacesi
New concrete: Chemical washing in order to remove laitance layers and efflorescence Worn concrete: Grinding, milling, shot peening, depending on the concrete conditions. Grinding is suitable for removing surface dirt on consolidated concretes. Shot peening and milling are more suitable for old and crumbling concretes or in case of removal of old paints. These operations must always be followed by an appropriate dust removal.
Preparation of the product
Mix the product according to the following ratio by weight: Component A : 100 Component B: 30 Mix Component A separately and then add Component B, while stirring continuously
Induction time
Not expected
Pot life
2 hours a 20°C
Thinning
20 - 30 % with water
Environmental conditions
Ambient temperature: from + 5 to 35° C Temperature of the support: > 10° C Humidity: 0 - 70 % In order to prevent the formation of condensation, it is necessary that the temperature of the substrate is at least 3° C above the dew point.
Drying and hardening time
For the thickness of 50 microns (wet) 10° C 20° C 30° C Dry to touch 6 3 1 hours Dry in depth 10 8 5 hours
Time of overpainting
Minimum (hours) 10° C 20° C 30° C 10 8 5 hours Maximum (months) 1
Application
Brush, roller, airless, spray If you use the brush, you have to use nylon or pure bristle brushes. If you use the roller, you have to use medium - haired rollers. For the application, use the method of crossing coats.